RAAC roof deck opened up for replacement

RAAC remediation

RAAC Roof Replacement, Phase 1

Phase one of a planned RAAC replacement, carried out while the building stayed open.

Sector

Workplace

Location

South Wales

Scope

RAAC removal and reinstatement

Delivered

2026

The brief

The client had confirmed RAAC planks over part of the roof and needed the worst-rated bays dealt with first. Our scope covered temporary weatherproofing, panel removal, new deck, insulation and a single-ply covering.

The challenge

The building remained in use throughout. Each bay had to be sealed and made watertight before the next was opened, and the rooms below were decanted in turn to an agreed schedule.

The result

Phase one completed to programme with no water ingress. Every bay was recorded and signed off with the structural engineer before it was closed up, and the remaining phases were priced from that record.

12

bays replaced

14

weeks programme

Open

building throughout

Indicative figures for concept purposes.

Roof deck during replacement